HP B-series 16Gb FC SwitchesQuick Start Instructions© Copyright 2012 Hewlett-Packard Development Company, L.P.Printed in the U.S.*5697-1520*HP Part Nu
• One accessory kit with the following items:Rack Mount Kit, including rails, rail mountinghardware, and plenum◦◦ HP product documentation, including
To install and operate the switch successfully, ensurethat:• The primary AC input is 85–264 VAC Nominal:100–40 VAC, 2.0 A; 47–63 Hz. The switchautosen
4. Attach each outer rail as shown in Figure 5 (page4).The rails are labeled Left and Right to designatethe left side and right side of the rack as vi
12. Proceed to “Switch setup ” (page 5).Install a standalone switch1. Unpack the switch and verify the contents asdescribed in “Verify the SN6000B 16G
Log in to the serial console port1. Verify that the switch has completed POST.When POST is complete, the port status, switchpower, and status LEDs ret
4. Enter the tsclockserver command tosynchronize local time using NTP:switch:admin> tsclockserver“<ntp1;ntp2>”The value of ntp1 is the IP add
2. Connect the Fibre Channel cables from the switchto your host and storage devices. Ensure that thephysical connections match the connections onthe D