Brocade Communications Systems MLX Series Przewodnik Instalacji Strona 195

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 342
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 194
Brocade MLX Series and NetIron XMR Hardware Installation Guide 181
53-1003267-02
Installing a NetIron XMR 32000 router
3
2. Route cables from slots #3 and #4 up through comb A. Refer to Figure 122.
3. Route cables from slots #5 and #6 up through comb B.
4. Route cables from slots #7 and #8 up through comb C.
Cable routing for the upper-right quadrant
Route cables from slots in numerical order starting with the cables for slot #15.
1. Route cables from slots #15 and #16 directly to the right through the side comb. Refer to
Figure 123.
FIGURE 123 Routing Upper-right quadrant cables to the right
1 Upper left quadrant 3 Comb B (slot #5 and #6 cables)
2 Comb C (slot #7 and #8 cables) 4 Comb A (slot #3 and #4 cables)
1
2
3
4
Przeglądanie stron 194
1 2 ... 190 191 192 193 194 195 196 197 198 199 200 ... 341 342

Komentarze do niniejszej Instrukcji

Brak uwag